INTERVES engineering activities are performed under the three main sections.
Data Sheets is basically the first link of a healthy purchasing and operation process. Incorrect or erroneous information flow means choosing products that are not suitable with the process during the purchasing process, and most importantly, the equipment is not protected effectively and correctly. In this process, INTERVES technical experts provide technical visits to their customers and provide support for the selection of the right product and system. | |
Vent Calculations are the calculations of vent openings should be sufficient to prevent internal pressure increase during normal operation of the equipment or in case of fire. There are standards such as API 2000 for storage tanks, API 520, AD 2000 Code for pressure vessels. As INTERVES engineering team, these calculations are made and we report these calculations to our customers by means of related software in order to prevent your equipment from being damaged by pressure increase as a result of normal operating conditions or even a possible fire or exothermic reaction. | |
Equipment MAWP Calculations are made to determine normal operation and emergency evacuation critical pressure values. The most important issue when choosing protective equipment is the set pressure and set vacuum values of the vent system. The equipment has not been designed in accordance with the standards or the max. If the resistance limits are uncertain, our expert engineers and pressure vessels, reactors, storage tanks and pipelines, taking into account the current conditions of the max. strength limits are determined. In this way, incorrect set pressure value selection is eliminated, risks and product losses are minimized. |